Plumbing for a wet bar
Plumbing joint point is in the ensuite wall
Need to open wall at rear wall of the sink connection
Drill hole in top plate feed the hot and cold make connections
Feed and fix pipping to trusses connection needed about
7mts not including the run up the wall and exterior wall length
Feed the pipping down the wall to a selected point
If need be I can cut the plaster out for point of connection
And end point