Australian Citizens With NV1 Clearance residing in Australia only respond
Material Data Officer Joint Command and Control (JC2) SPO JC4S CJC03 3.1 Integrated Logistics Support Management - L3 NV1 Fyshwick, Canberra ACT No
3.1 Integrated Logistics Support Management L3
Responsibilities
- Coordinate the Integrated Logistics System (ILS) requirements related to developing, reviewing and validating project, SPO and Contractor Materiel technical data documentation to ensure that all in-service technical support considerations of JC2 SPO supported equipment and logistics policies are addressed.
- Undertake an active role in process improvement activities.
ILS artefacts
1. Safety Data Sheets
2. Complete Equipment Schedules
3. User Hand Books/Manuals
4. Codification and Cataloguing
5. Sparing Analysis
6. RAM Reports
7. LORA
8. FMECA
9. EMEIs
10. ILSIs
11. Maintenance documentation as directed.
#J-18808-Ljbffr